Pillar two
Devices & equipment
Supply is where fit-out projects usually lose time. Equipment is ordered late, arrives unconfigured, and sits in boxes while staff wait. We treat procurement as part of the programme, not as an afterthought.
What we supply
Mobile & personal
Mobile phones, smartphones and tablets for corporate fleets, including SIM provisioning, enrolment and mobile device management where you run one.
Computing
Laptops, desktops, workstations, servers, storage, monitors, docking stations and peripherals, specified to the work rather than to a price list.
Telecommunications
Handsets, IP telephony and VoIP systems, routers, modems, SIM-enabled devices, two-way radio and terminal equipment.
Network hardware
Switches, access points, wireless controllers, firewalls, optics and patch leads, racks, PDUs and UPS.
Consumables & spares
Accessories, batteries, chargers, spare parts and the holding stock that makes a service level agreement credible rather than aspirational.
Lifecycle
Configuration, imaging, provisioning, asset-tagging and desk-side deployment; repair, refurbishment, trade-in and responsible disposal at end of life.
How we buy
- We specify to a standard and a quantity, then quote line by line — you see what each item costs and what it is for.
- Equipment is configured, imaged and asset-tagged before it reaches your floor, so deployment is a delivery rather than a project.
- Serial numbers are recorded on the delivery note and handed over as an asset register you own.
- Warranty documentation is registered in your name, not ours.
- Imported items are priced against the exchange rate and duty at the date of clearing, and we say so on the quotation rather than in a dispute later.
Group capability
Our procurement is backed by relationships that predate this company.
GoSmart Infra sits alongside established sister operations in the same group with existing device supply channels and trading history. Corporate, institutional and project-linked supply runs through GoSmart Infra; consumer and retail trade sits elsewhere in the group. That separation is deliberate.
Send us the equipment list.
Tell us the headcount and the roles, and we will specify to the work rather than to a price list.