GoSmart InfraLimited

Pillar one

Build & fit-out

We take responsibility for the physical fabric of the workplace — the parts that are expensive to correct once the ceiling grid is closed and the staff have moved in.

Scope

Survey & space planning

Measured survey of the existing shell, space planning against your headcount and the way your teams actually work, and a layout you can sign before anything is ordered.

Partitioning & ceilings

Drywall and glazed partitioning, acoustic treatment where meeting rooms need it, suspended and feature ceilings with the access panels the services behind them will need.

Flooring & finishes

Raised access floors, vinyl, carpet tile and tiling, skirting, painting and decoration to a specified finish schedule.

Joinery & furniture

Reception desks, counters, storage and fitted joinery; supply and installation of workstations and seating where the fit-out includes furniture.

Power distribution

Distribution boards, small power and lighting circuits, containment and trunking, floor boxes and desk power, all tested and certified circuit by circuit.

Generator & UPS

Standby generator and UPS provision, changeover arrangements, load assessment and the separation of critical from general circuits so the servers ride through a cut.

Earthing & surge

Bonding, earthing and surge protection designed to IEC 62305 principles — the single most under-specified item in most Ghanaian fit-outs, and the cause of most avoidable equipment failure.

Phased remodelling

Refurbishment of occupied premises in phases, out of hours where required, so the business keeps trading while the work goes on around it.

What you actually get

  • A single programme showing every trade, with the dependencies between them made explicit.
  • One site supervisor accountable for sequencing, so cabling is not pulled before containment is up and ceilings are not closed before testing.
  • Electrical test certificates for every circuit, issued at handover rather than promised afterwards.
  • As-built drawings and a labelled, documented installation the next contractor can work on without guesswork.
  • A live snag list you can see, and a defects period during which we come back.

We do not close a ceiling before the services above it are tested.

It sounds obvious. It is also the single most common reason a fit-out overruns in its final fortnight, and it is why we hold the works and the systems on one contract rather than hoping two contractors coordinate themselves.

Send us the floor plan.

We survey the space at no cost and come back with a specification and a price you can compare line by line.